Behind the Scenes : C Channel Stiffing Assembly

This is one of our short projects done very recently. The project requirements had to be stripped down to just the basic concept so as to make it possible for us the fit in a tight schedule. The team worked very efficiently to deliver the rendered output.

bts13-eo008-inpost03 bts13-eo008-inpost04

This project had us working on a visualisation of a very strong industrial grade adhesive which was to be used and applied automatically on a C channel assembly. We prepared a basic rig for the arm of the adhesive nozzle. We also created a conveyor belt for transporting the C channel to the next station. The project was completed in a few days.